![]() ![]() You may also mail a letter of explanation to the City Clerk's Office at the address noted on the ticket. Your appeal will be sent to the parking manager who will review your dispute and provide a response in writing. Go to the City Clerk's Office located on the 1st floor of City Hall to fill out an appeal. Whom do I contact if I wish to dispute a parking ticket? If an city employee is seen taking down or putting up signs, feel free to ask them about signs. Call the Public Works Department at 51 to request a sign. Most removed signs are available to city residents at no charge. What does the Engineering Division do with old signs when they are taken down? View the Right-of-Way Permit page for more information. A revocable license may be issued for pre-existing or unusual conditions. Can this be done?Ĭonstruction in the right-of-way that could present a hazard to traffic or interfere with maintenance or construction activities is not permitted. I'd like to put a fence, bench, planter and/or garden in the space between the sidewalk and the street. If you have any questions, please contact the Engineering Division at 51. The City of Jackson is no longer placing banners across Michigan Avenue. What is the process for banner approvals? Our organization would like to hang a banner over the street to announce an upcoming event. If ordered for construction, property owners would be assessed for their share of the construction cost. The resident must obtain a petition from the City Clerk's Office.Īccording to City Ordinance, public improvements such as street construction can be initiated by petitions signed by at least 50% of property owners. ![]() If the alley belongs to the city, there is the possibility that it can be paved. Can I get the alley paved next to my property? If it is not scheduled for reconstruction, the resident can obtain a petition from the City Clerk's Office.Īccording to City Ordinance, petitions signed by at least 50% of property owners can initiate public improvements such as street construction. Who do I contact to have my street reconstructed, paved, or to have a curb or gutter added?Ĭontact the Engineering Division at 51 to see if the street is scheduled for construction within the next few years. To learn more, visit the Vehicle Detection Loops page. When you pull up to a traffic signal that has a vehicle detection loop, you must actuate the loop by stopping on the stop bar. More and more intersections with traffic signals are being installed with vehicle detection loops. Sometimes I pull up to a traffic signal and the light does not change to green. Orange flags are used to call your attention to some kind of change such as speed limit raised or lowered, a new traffic signal installed, or angle parking changed to parallel parking. Why are flags sometimes attached to signs? Learn how to submit a written request on the Requesting Parking Regulation Changes page. How do I get parking regulations changed on my street? When a curb is reconstructed, access to drives is not possible for several days while the concrete hardens. Access is provided for local traffic to get to their homes or businesses and get into their driveways. Can people park in their driveway during street construction? Watering is the responsibility of the property owner. The city places topsoil and seed to replace grass removed during construction. Does the city water grass seed planted after construction projects? The property owner is responsible for all sewer problems up to the connection to the city sewer main. Who is responsible for sewer problems at a residence? When is an Oversized Vehicle Permit required and where can I obtain the permit?Ĭheck out the Oversized Vehicle Permit page for more information about obtaining a permit. Any change in intersection traffic control needs to be approved by City Council. If this is the case, your request will be forwarded to MDOT. Some intersections are on Michigan Department of Transportation (MDOT) streets. The request will be investigated and you will receive a response. Can I get a stop sign, yield sign, or traffic signal installed at a particular intersection?Ĭall the Engineering Division at 51 and tell the engineering assistant the specific intersection and why you believe traffic control is needed. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |